Recent News

February 2011 – VULCAN Full-scale Prototype

NAVSEA has awarded Safe a contract modification to fabricate a full-scale prototype of the VULCAN (shock and vibration resistant stowage system) and to continue the Phase II SBIR development effort. Safe is engineering the VULCAN, a reconfigurable common cradle pallet assembly for use on the Littoral Combat Ship, to securely stow and transport the ship’s mission-specific watercraft.

Posted in US Navy |

January 2011 – Crashworthy Troop Seat for Helicopters

Safe, Inc. has been awarded a Phase II SBIR contract to continue the development of a lightweight crashworthy troop seat for use in all Navy helicopters.

The 18-month project will produce a qualified seat, common to multiple aircraft, with advanced crash protection and troop accommodation features.

Posted in Crashworthy Troop Seats, US Navy |

January 2011 – Hypoxia Early Warning Kit

Safe, Inc. has been awarded a Phase II SBIR contract to continue the development of a hypoxia monitoring and warning system for use by pilots of high altitude/high-performance aircraft.

Posted in US Navy |

December 2010 – Drop Tower Expansion

Safe, Inc. is conducting an expansion of its dynamic drop tower test capabilities.

This expansion will increase Safe’s ability to conduct accurate, repeatable dynamic tests while meeting various test pulse specifications.

Posted in Safe |